Sarnia Road Bridge Replacement
Client Information
- Name: CITY OF LONDON
Project Information
- Location: London, ON
- Delivery Method: Lump Sum
- Sector: Civil
- Sub Sector: Bridge
- Status: Completed
- Completion Date: November 2011
Overview
The Sarnia Road Improvements project includes the removal of the existing Sarnia Road bridge and the construction of a new overhead structure with a width of 95m and a length of 15m. Roadworks included as part of this project include the expansion of Sarnia Road from 2 lanes to 4 lanes from Aldersbrook Rd. to Beaverbrook Ave., street lighting, bike lanes, sidewalks, noise walls on the north side of Sarnia Road, storm water servicing and the replacement and relocation of a 600mm watermain, including a watermain crossing under the CPR tracks using the pipe ramming method.






