MC Group

Other sites in our network:
McKay-Cocker
London: 519-451-5270 • Toronto: 905-890-9193

Our Projects

Search

Sarnia Road Bridge Replacement

Client Information

  • Name: CITY OF LONDON

Project Information

  • Location: London, ON
  • Delivery Method: Lump Sum
  • Sector: Civil
  • Sub Sector:
  • Status: Completed
  • Completion Date: November 2011

Overview

The Sarnia Road Improvements project includes the removal of the existing Sarnia Road bridge and the construction of a new overhead structure with a width of 95m and a length of 15m.  Roadworks included as part of this project include the expansion of Sarnia Road from 2 lanes to 4 lanes from Aldersbrook Rd. to Beaverbrook Ave., street lighting, bike lanes, sidewalks, noise walls on the north side of Sarnia Road, storm water servicing and the replacement and relocation of a 600mm watermain, including a watermain crossing under the CPR tracks using the pipe ramming method.

← Return to Projects

project photos
project photosproject photosproject photos

McKay-Cocker evaluates all of our projects to minimize the environmental impact that we will have during construction.